Rabbit OP7100 User Manual Page 85

  • Download
  • Add to my manuals
  • Print
  • Page
    / 126
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 84
OP7100 Installation
85
FD
JP5
12
0 V/GND
FGND
JP5
12
0 V/GND
FGND
Bezel/Casing to Power Supply GND
Bezel/Casing to External Ground
External
Ground
External
Ground
JP4
JP5
JP3
Figure 6-1 shows the location of header JP5.
Figure 6-1. Location of Header JP5
Installation Guidelines
When possible, following these guidelines when mounting an OP7100.
1. Leave sufficient ventilation space
2. Do not install the OP7100 directly above machinery that radiates a lot
of heat (for example, heaters, transformers, and high-power resistors).
3. Leave at least 8" (20 cm) distance from electric power lines and even
more from high-voltage devices.
4. When installing the OP7100 near devices with strong electrical or
magnetic fields (such as solenoids), allow a least 3" (8 cm), more if
necessary.
The OP7100 has strong environmental resistance and high reliability, but
you can maximize system reliability by avoiding or eliminating the
following conditions at the installation site.
Abrupt temperature changes and condensation
Ambient temperatures exceeding a range of 0°C to 50°C
Relative humidity exceeding a range of 25% to 65%
Strong magnetism or high voltage
Corrosive gasses
Direct vibration or shock
Excessive iron dust or salt
Spray from harsh chemicals
Page view 84
1 2 ... 80 81 82 83 84 85 86 87 88 89 90 ... 125 126

Comments to this Manuals

No comments